【災害後復興プロセスの運営:バム地震後の住宅再建】
Organising Post-Disaster Reconstruction Processes 1st ed. 2018(The Urban Book Series) H XXII, 283 p. 47 illus., 45 illus. in col
Arefian, Fatemeh Farnaz 著
目次
Part I Introduction.- Chapter 1. Introduction.- Chapter 2. Methodology.-Part II Literature Review.- Chapter 3. Post Disaster Reconstruction, Recovery and Development.- Chapter 4. Organising Reconstruction.- Part III Case Study.- Chapter 5. Earthquake Prone Iran.- Chapter 6. The Bam Urban Area: the Past and Earthquake.- Chapter 7. Organising the housing reconstruction programme in Bam.- Chapter 8. Implementation and the Dynamic Evolution of the Bam Housing Reconstruction Programme Delivery System.- Part IV Analyses.- Chapter 9. Organisational Configuration of the Socio-technical System: Consistencies and Inconsistencies.- Chapter 10. Analysis of the Strategic Nature of the Bam Housing Reconstruction Programme.- Chapter 11. Analysis of the Social Nature of Reconstruction in Bam .- Chapter 12. Analysis of the Multi-organisational Nature of the Bam housing Reconstruction Programme.- Part V Conclusion .- Chapter 13. Concluding Discussions.- References.
カート
カートに商品は入っていません。